金币
UID176556
帖子
主题
积分25076
注册时间2014-6-6
最后登录1970-1-1
听众
性别保密
|
欢迎您注册蒲公英
您需要 登录 才可以下载或查看,没有帐号?立即注册
x
In-process Control
In-process inspection and testing should be performed based upon monitoring the process or actual sample analysis at defined locations and times. Sampling methods should be documented to ensure that the sample is representative and clearly labelled.
In-process samples should not be returned to production for incorporation into the final batch.
The results of in-process tests should be recorded and should conform to established process parameters or acceptable tolerances. Work instructions should define the procedure to follow and how to utilise the inspection and test data to control the process. There should be defined actions to be taken when the results are outside specified limits.
Where approval to continue with the process is issued within the production department, the specified tests should be performed by trained personnel and the results recorded.
注:上文选自IPEC 辅料GMP
想咨询一下,针对车间内部进行的IPC检测,比如薄层检测(TLC),是否有要求必须进行照相处理,以作为批记录的一部分????或者针对于某些鉴别检测(比如显色,沉淀析出等等)是否也要求进行拍照处理????
|
|